Second stage of Western Harbour Tunnel begins

Once complete, the tunnel will connect motorists between the Warringah Freeway and Rozelle Interchange, allowing motorists travelling between the north and west to bypass traffic in the CBD, linking to the . The government hopes it will ease congestion on the Harbour Bridge, Harbour Tunnel, Anzac Bridge and Western Distributor.

harbour Tunnel at Cammeray.” srcset=”https://static.ffx.io/images/$zoom_0.151%2C$multiply_0.9735%2C$ratio_1.5%2C$width_756%2C$x_0%2C$y_0/t_crop_custom/q_86%2Cf_auto/6153c1be61075665e8c13731b0880a08d46a994a” itemprop=”image” layout=”responsive” height=”1″ width=”1.5″/>

The 100-tonne road header began tunnelling on the second stage of the Western Harbour Tunnel at Cammeray. Dion Georgopoulos

The tunnel was as initially planned to be attached to the Beaches Link, the motorway connecting the city to the northern beaches. But Labor…

Continue reading this news article…